How we work
Six phases, each with its duration and with what we need from you so it does not stall. The deadlines in the contract are based on this table.
0
Kickoff and content collection
7 days
We agree the site structure, the goals and who decides what. You get a structured brief, page by page, with examples and character limits.
This is where projects die. Not in development. A project that starts with complete material finishes on time almost every time.
From you
The copy, the photos, the logo, the accesses. Or the decision to have us write them.
1
Structure
4 days, plus 3 for your approval
Information architecture and wireframes — what sits on each page and in what order, without colours and without fonts.
From you
A written approval. Structural changes made after design cost five times more.
2
Design
7 days, plus 3 for your approval
Design for two key pages, from which the rest is derived. Two rounds of revisions included.
From you
Specific, grouped feedback. “I don’t like it” is not feedback; “the heading gets lost on that background” is.
3
Development
10 days
We build the site, make it fast and prepare it for search engines.
From you
Nothing. It is the one phase where you can forget about us.
4
Content and testing
5 days, plus 3 for your feedback
Final content goes in. We test on real phones and browsers, and check the forms, the speed and the accessibility.
From you
A review from you. It is the last cheap moment for corrections.
5
Launch and training
2 days
We move the site to your domain, put the redirects from the old one in place, and connect analytics and Search Console.
From you
An hour of your time for training. We record the session, so whoever comes after you can watch it too.
Who we are
We started VVR Tech because we kept seeing the same scene repeat: a good company, with happy clients, and a website that said nothing about it. Sometimes built by someone who vanished after delivery. Sometimes built cheaply and rebuilt three times in two years, which cost more in the end.
We work directly with every client, from the first conversation until after launch. Projects do not pass through five pairs of hands, and there is no sales department promising things someone else has to deliver.
What we try to do differently is not spectacular: a firm quote up front, a deadline written into the contract, and someone who still answers the phone in month six.
In business since 2025.
- 20+
- Projects delivered
- 3–8
- Weeks, from start to launch